Advance Solar delivered a 400 kW solar PV installation across multiple buildings within The Knox School campus.
To ensure zero disruption to students and staff, all rooftop and electrical work was completed exclusively during school term breaks. Each installation required detailed structural assessment, engineering review and careful planning of cable routes and inverter placement.
A campus-wide aerial view showcasing the distributed 400 kW solar system installed across several buildings. Each array was positioned based on roof structure, shading analysis and optimal energy generation.
Advance Solar technicians performing final wiring and commissioning of the Fronius inverter system. All electrical works were completed during term breaks to eliminate disruption to school operations.
One of the major rooftop installations, featuring multiple panel rows installed with precision to ensure maximum system efficiency throughout the school year.